Under Construction

May 30, 2012

Under Construction

The lifts will be shipped June, 25 so we expect that they will be installed one or two weeks after that.  The Bride’s Room has been demolished.  The repair of the South Wall has been awarded to Ron Loop Construction, we are waiting for a revised estimate from them, for the repair of the Bride’s Room wall and the build-out of the handicap accessible bathroom.  The Church roof replacement has been awarded to Allied Construction and should happen sometime this summer.

Back